Operational power plant by 2032 unlikely without BNPP revival – lawmaker

By Almira Louise S. Martinez, Reporter A commercially operational power plant by 2032 can be achieved through the Bataan Nuclear Power Plant (BNPP) revival, a congressman said on Monday.  As mentioned in the Philippine Nuclear Energy Roadmap, the country aims to include nuclear power plants in the power mix by introducing at least 1,200 megawatts […]

Operational power plant by 2032 unlikely without BNPP revival – lawmaker
By Almira Louise S. Martinez, Reporter A commercially operational power plant by 2032 can be achieved through the Bataan Nuclear Power Plant (BNPP) revival, a congressman said on Monday.  As mentioned in the Philippine Nuclear Energy Roadmap, the country aims to include nuclear power plants in the power mix by introducing at least 1,200 megawatts […]